Every chart on the site has its rows here as CSV, with the source column kept: 580 files across 60 articles. Free to download and reuse under CC BY 4.0; cite Open Factory and the original document named in each row.
Model tables
Public headline and bands on each model page. Rows, history and API are Institutional.- Book-to-Bill League Table3.0x
- Datacenter MEP Cost Table$9.8M per MW
- Large-Load Cost Table2033
- Lead-Time Monitor50 weeks
- OEM Disclosure Scorecard12 of 90
- Public Bid-Tab Price Book$69/kVA
- Equipment Price BenchmarkContribution form open
Electrical gear
118 filesModular Is Not Cheaper: A 50 MW Prefab Electrical Room, Line by Line
800 VDC Will Strand Your White-Space Frame Agreement
The 2 MW Plant Service Upgrade Nobody Budgets Right
When a Megapack Beats a Static UPS
The OEM Disclosure Scorecard: Who Tells Buyers Anything
Why Your Switchgear Costs 50% More Than in 2021
- 01-switchgear-ppi.chart.csv
- 01-switchgear-ppi.csv
- 02-cost-structure-335313-bea2017.csv
- 02-cost-structure.chart.csv
- 03-decomposition-sensitivity.csv
- 03-decomposition.chart.csv
- 03-decomposition.csv
- 04-eaton-electrical-americas-annual.csv
- 04-eaton-electrical-americas-margin.csv
- 04-eaton-margin.chart.csv
- 05-powell-backlog.chart.csv
- 05-powell-backlog.csv
- 05-powell-gross-margin.csv
- 06-lead-times-by-class.csv
- 06-lead-times.chart.csv
- 07-census-m3-3353-unfilled-over-shipments.csv
- 07-m3.chart.csv
- 08-copper.chart.csv
- 08-copper.csv
- 09-oem-price-taking.csv
- 10-switchgear-ppi-yoy.chart.csv
- 10-switchgear-ppi-yoy.csv
Vertiv Stopped Reporting Its Backlog. Here Is Our Estimate
Transformer Lead Times Hit 143 Weeks: Who Gets Delivered First
One Steel Mill Gates Every US Transformer
Cummins and Caterpillar Are Sold Out Through 2028
Book-to-Bill League Table, Q2 2026: Every Electrical OEM
Introducing the Open Factory Lead-Time Monitor
- 01-eleven-class-range.csv
- 02-schneider-family-ranges.csv
- 03-schneider-flags-sep-2026.csv
- 04-m3-naics3353-unfilled-over-shipments.csv
- 05-ppi-transformers-switchgear.csv
- 06-ism-supplier-deliveries-capex.csv
- 07-coverage-by-class.csv
- 08-backlog-from-filings.csv
- lead-time-monitor-v0.1.csv
- schneider-lead-times-sep-2026.csv
Power and grid
96 filesWhat 50 MW Costs in 15 US Markets
The 2% Funnel: 474 GW Requested, 9 GW Approved, 5.8 GW Energized in ERCOT
A Factory Owner's Guide to the PJM Capacity Charge
The $60 Million Deposit: How Equipment Slots Became Datacenter Currency
Behind the Meter, In Front of the Queue: 90 GW Announced, 2 GW Running
Recips vs Turbines vs Fuel Cells for a 100 MW Bridge
- assumptions.csv
- cost-stack-per-mwh.csv
- eia-state-gas-prices-monthly.csv
- eia860m-planned-gas-units.csv
- five-year-cost-stack.csv
- heat-rate-fuel-cost.csv
- henry-hub-monthly.csv
- lead-time-to-first-power.csv
- mwh-delivered-by-2029.csv
- nox-tons-per-year.csv
- price-book.csv
- price-points-per-kw.csv
- scenarios.csv
- sensitivity-gas-price.csv
- sensitivity-utilization.csv
- state-cost-per-mwh.csv
- state-gas-basis.csv
What Hyperscaler Nuclear PPAs Tell a Factory Negotiating a 15-Year Contract
The 30% Fuel-Cell ITC Is the Last Federal Subsidy for On-Site Power
Introducing the Large-Load Cost Table: 15 Markets Side by Side
Cooling
52 filesDry Cooler or Cooling Tower: What the Water Bill Says in 15 Markets
The R-454B Summer: What the Refrigerant Switch Did to Chiller Prices
OFCI vs Design-Build: How Hyperscalers Buy Chillers and Colo Developers Do Not
Compressed Air Is 10% of Your Factory's Power Bill
- assumptions.csv
- cagi-200hp-comparison.csv
- cagi-sheets.csv
- compressor-public-awards.csv
- eia-industrial-rates-2025.csv
- iac-compressed-air-measures.csv
- iac-leak-payback-distribution.csv
- plant-model.csv
- ppi-compressors.csv
- rebates-other-compressed-air-measures.csv
- rebates-vsd-compressor-by-program.csv
- ten-year-cost.csv
- vsd-part-load.csv
Five Majors Bought Their Way Into Liquid Cooling. Here Is the Price List
Chillers Are the 60-Week Problem
Machinery and automation
115 filesFiber Laser Cutters: What a $500,000 Price Gap Buys
CloudNC and Limitless Labs: AI Is Coming for the CNC Programming Bottleneck
1,250 Hours: Reading BMW's Humanoid Pilot as a Buyer
The $306k Machine: A Record Half-Year With Fewer Units
From 36 Weeks to Stock: The ControlLogix Lead-Time Cycle
A Robot Costs $61k. The Cell Costs $150k
- a3-average-price.csv
- arm-price-by-payload.csv
- arm-prices-observed.csv
- assumptions.csv
- cell-cost-stack.csv
- fanuc-crx-price-step.csv
- federal-robot-awards.csv
- ifr-installs-by-country.csv
- integration-multiple.csv
- machine-tending-waterfall.csv
- payback-vs-shifts.csv
- published-cell-prices.csv
- reseller-premium.csv
- welder-wages-by-state.csv
What a Haas VF-2 Really Costs in 2026
- configuration-ten-year.csv
- eia-industrial-price.csv
- financing-vs-cash.csv
- haas-list-price-ladder.csv
- haas-tooling-prices.csv
- machine-tool-ppi.csv
- machinio-asking-bands.csv
- pm-benchmarks.csv
- tco-ten-year.csv
- used-listings-observed.csv
- used-market-price-visibility.csv
- used-supply-by-model-year.csv
- utilization-sensitivity.csv
1872, Foundational Industries and Hadrian: Three Blueprints for the Autonomous American Factory
Japan Is Eating the US Capex Boom
Who Bought the EV Plants' Machines
MES Is a Consulting Product
Building the Missing Index: Realized Auction Prices for Used CNC Machines
Procurement
199 filesTariffs, September 2026: The Actual Schedule for Machinery and Electrical Gear
SendCutSend: How a Bootstrapped Reno Shop Became a $1 Billion Parts Factory
The Recommended Spares List Is Where the Margin Hides
Liquidated Damages at 0.5% a Week: Why Caps Sit at the Vendor's Margin
How to Write an RFQ for Capital Equipment in 2026
Grainger's 2017 Confession: The Year a Distributor Admitted Its List Prices Were Fiction
- distributor-revenue-gross-margin.csv
- fastenal-vending-digital.csv
- grainger-gross-margin-by-year.csv
- grainger-segment-sales.csv
- grainger-sourcewell-hotlist-by-brand.csv
- grainger-sourcewell-hotlist-histogram.csv
- grainger-sourcewell-hotlist.csv
- grainger-us-segment-quarterly.csv
- mro-contract-discounts.csv
- price-realization-grainger-fastenal.csv
- pricing-timeline.csv
Reading a Switchgear Quote: The Eleven Line Items That Hide the Schedule
Grainger vs McMaster vs Amazon Business: A 50-SKU Price Basket
- basket-total-by-distributor.csv
- basket.csv
- buying-rule.csv
- cheapest-by-category.csv
- contract-adjusted-basket.csv
- coverage.csv
- grainger-hotlist-basket-matches.csv
- grainger-reference-vs-web.csv
- hotlist-discount-histogram.csv
- premium-by-distributor.csv
- sku-spreads.csv
- sourcewell-fastenal-discount-schedule.csv
- sourcewell-grainger-hotlist-by-category.csv
- sourcewell-grainger-hotlist.csv
- spread-by-category.csv
Who Gets the IEEPA Refund
Nox Metals: The Detroit Startup Cutting Aluminum Plate in 36 Hours
What 2,439 Public Change Orders Show About Electrical and Mechanical Contractors
Copper at $6.77: How a 50% Tariff Shows Up in a 200-Amp Panel
The Used and Refurbished Market Nobody Indexes
Rockwell's 250 Basis Points: How Tariffs Show Up in Your PLC Quote
Datacenter Construction Is Eating Your Electricians
- apprenticeship-electricians-top-occupation.csv
- apprenticeship-national-fy2008-2021.csv
- apprenticeship-state-totals-fy2019-2021.csv
- datacenter-pipeline-facts.csv
- fred-cpi-construction-earnings.csv
- oes-wages-by-metro-2019-2025.csv
- qcew-electrical-contractors-by-county.csv
- qcew-electrical-contractors-by-state.csv
- travel-card-per-diem-terms.csv
- wages-vs-inflation-2019-2025.csv
Quote Check: What Your Switchgear Quote Should Have Said
Tariff Bill of Materials: What Sections 232 and 301 Add to a UPS, a Lineup, a Genset and a Megapack
- bess-duty-stack.csv
- bom-by-mass.csv
- bom-by-value.csv
- bom-mass-stacked.csv
- china-finished-stack.csv
- copper-232-alone.csv
- finished-import-by-origin.csv
- hts-codes.csv
- instrument-timeline.csv
- lineup-origin-sensitivity.csv
- metal-prices-index.csv
- metal-prices-levels.csv
- origin-switch-stack.csv
- stacking-rules.csv
- us-assembly-stack.csv
The Copper and Wire Price Sheet, Weekly
The $2,850 Report That Says Nothing
Introducing the Public Bid-Tab Price Book
The 171-Day Capex Lead Time: ISM's Most Ignored Table
How to cite and what to expect
Each CSV is the exact table a chart was drawn from. Columns are named in plain words, units are in the header, and a source column points to the filing, tariff, docket, award or series the row came from. Cite as "Open Factory, article title, data as of date" and the original source. Corrections to [email protected]; the corrections page lists every change to a published number.