ReferenceLead times by equipment class
LV power circuit breaker, MTZ/NW/P/R frames lead time: 20 to 24 weeks
LV power circuit breaker, MTZ/NW/P/R frames: how long is the lead time?
In short. LV power circuit breaker, MTZ/NW/P/R frames is quoted at 20 to 24 weeks, per Schneider Electric Lead Times Guide, September 2026 edition. 5 product rows, made-to-order weeks from release to manufacturing. Open Factory's Lead-Time Monitor carries this figure as of September 2, 2026.
Facts
| Equipment class | LV power circuit breaker, MTZ/NW/P/R frames (Schneider) |
|---|---|
| Group | Schneider Electric Lead Times Guide |
| Published lead time | 20 to 24 weeks |
| Basis | 5 product rows, made-to-order weeks from release to manufacturing |
| Published by | Schneider Electric Lead Times Guide, September 2026 edition |
| Document date | September 2, 2026 |
| Data as of | September 2, 2026 |
Questions
LV power circuit breaker, MTZ/NW/P/R frames: how long is the lead time?
20 to 24 weeks, per Schneider Electric Lead Times Guide, September 2026 edition. 5 product rows, made-to-order weeks from release to manufacturing.
Who published this lead time?
Schneider Electric Lead Times Guide, September 2026 edition. This is the OEM's own planning figure for made-to-order product, not a quote. Open Factory reprints it with the document and its date.
How often is this page updated?
Monthly, when the Lead-Time Monitor edition is released. The date on the page is the date of the data, not of the page.
Sources
Data as of September 2, 2026. This page is rebuilt from the same table the Lead-Time-Adjusted Schedule, the API and the MCP server read, so the figures cannot differ. Also available as plain markdown. Cite as Open Factory, LV power circuit breaker, MTZ/NW/P/R frames lead time: 20 to 24 weeks, September 2, 2026.



